Judi’s Gym Basketball Pavilion
Pavilion Structure for Basketball Activities
Provide a detailed description of the project scope, key challenges, solutions implemented, and successful outcomes. Include details such as project size, complexity, unique features, or value engineering measures.
The project consists of the design, engineering, and construction of a new Pre-Engineered Metal Building (PEMB) Open Air Pavilion to house three full-sized basketball courts. This project included all associated site work, utility connections, drainage improvements, and the development of a paved parking lot to support user access and event capacity. The pavilion is intended to serve as a multipurpose recreational space for year-round use, providing a sheltered, open-air environment that accommodates sports activities, community gatherings, and organized events.
Dimensions: Approx. 70 feet x 300 feet, with a minimum clearance height of 22 feet at the eaves to ensure safe play and spectator clearance.
Roof system: Standing seam metal roof with a 1:12 slope, complete with integrated gutter and downspout systems for stormwater management.
Lighting: LED sports lighting mounted to structure to provide nighttime visibility per recreational standards. Site lighting poles with LED fixtures to provide security and usability during evening hours.
Electrical system: Conduit and panels to support lighting, outlets, and future upgrades (e.g., scoreboards, PA system).
Stormwater management: Grading, swales, catch basins, and underground piping as needed to ensure proper drainage and erosion control.
Project Stats:
Location: 5280 Dolan St., Ave Maria, FL 34142
Year Completed: 2022
Contract Amount: $1,108,618.00