Projects

Eagle Lake Park Aquatic Center, Collier County, Fl- Under Construction June, 2017

EagleLakeCommPk-050417-1953EagleLakeCommPk-050417-1954EaglesLakeAquatic060917-2775EaglesLakeAquatic060917-2776

Woodchip Bio-Reactor, Bonita Springs, FL – Completed June 2017

Clearing 7 Clearing 8picture 1picture 2picture 3picture 4picture 5

_________________________________________________________________________________

Youth Haven Shelter for Homeless Teens, Naples, FL – Under Construction 2017

Youth Haven, Inc 1702282036  IMG_20170317_162133010IMG_20170317_162108628 Youth Haven, Inc 1704262031Youth Haven, Inc 1706262188 ________________________________________________________________________________

Lee County – Scale House No. 2, Fort Myers, FL – Completed June 2017

20161202_152328 (002) Scale House canopy foundation canopy foundation 2  Resized_20170305_145946 (002)Resized_20170305_145924 Resized952017030595163729 IMG_1704

_________________________________________________________________________________

 The City of Naples Utilities Maintenance Building Replacement – Completed June 2017

Utilities Maintenance Bldg 1607252133 utilities-maintenance-bldg-1608272215 utilities-maintenance-bldg-1609290067 utilities-maintenance-bldg-1610270060 utilities-maintenance-bldg-1611282208 utilities-maintenance-bldg-1612202109Utilities Maintenance Bldg 1701262290Utilities Maintenance Bldg 1702282040  Utilities Maintenance Bldg 1703272271 Utilities Maintenance Bldg 1704262040Utilities Maintenance Bldg 1705262177Utilities Maintenance Bldg 1706262182

______________________________________________________________________________________________________________________________________

Collier County Sheriff’s Office Orangetree Substation – Completed 2017

Substation (800x260) Sheriff Office EMS-12 1604082220 Sheriff Office EMS-12 1605102206 Sheriff Office EMS-12 1606132206 Sheriff Office EMS-12 1607252146 sheriff-office-ems-12-1608092155 sheriff-office-ems-12-1609122005 sheriff-office-ems-12-1610112015 sheriff-office-ems-12-1612152010  Sheriff Office EMS-12 1702092078

______________________________________________________________________________________________________________________________________

Collier County CAT Facility Phase II – Completed 2017

IMG_0141 20160426_151545_001 20160428_153541_001 CAT Passenger 1605102191 CAT Passenger 1606132186 CAT Passenger 1607130328 cat-passenger-1609122034 cat-passenger-1610112051 cat-passenger-1611102058  cat-passenger-1612152039

 

 

______________________________________________________________________________________________________________________________________

Collier County Courthouse 1st Floor Renovation – Completed 2016

IMG_3391 IMG_3388 IMG_3386 IMG_3409 IMG_3417

______________________________________________________________________________________________________________________________________

Collier County Supervisor of Elections Building Renovation

Outside 2 Outside 3

______________________________________________________________________________________________________________________________________

Reconstruction of Iberia Bank Daniels Parkway – Drive-Thru Collapse

IMG_2255 IMG_2210 IMG_2177 IMG_2253 IMG_2250   IMG_2884

_________________________________________________________________________________

Myakka State Park Cabin, Pavilion and Restroom Renovation, Sarasota County, Florida

Refurbishment of Cabins 1 thru 5, Pavilion and Latrine. Accessibility Improvements in Cabin 5 at the Myakka State Park, Sarasota County, Florida.  Florida Department of Environmental Protection Division of Recreation and Parks Bureau of Recreation and Construction. Elevation of Cabins 18″ with structural and building repairs and reconnect all utilities while preserving the integrity of the historic buildings.

 

01eb9c6cdc512ec76af7f416efde1560e26b97c586 015f760e6f1091cc76b9a1effedfa0df1a2cee41df 0134f2c44d68b3376fdfde51d869cb001951845844 01454f383bb6cdb98d94a796cc0bd4e825baa751c7 01973ce9991326919d37ed329d0548f07f499f5205

_________________________________________________________________________________

Panera Bread Stores #1233, #1741, #1029, #1600 & #1233 – Northeast and Southwest Florida

Renovation of  Five Panera Bread Stores located in Northeast and Southwest Florida completed between July and September, 2014. Renovation work consisted of demolition, interior re-paint, signage, millwork, flooring replacement,  bakery equipment upgrades, electrical and plumbing upgrades and restroom ADA compliance. All construction activity was completed while maintaining a fully operational and functional store.

Overall

_________________________________________________________________________________

Palmetto Point Elementary – Naples, Florida


New construction of a two story 122,000 square foot $30 million elementary school. Situated on 34.75 acres with 22.75 acres being developed and the remaining acreage was left undeveloped as a small preserve. Included in the project was the construction of a water and waste water treatment facility and generator which allowed the school to act as a hurricane shelter. The school was constructed using tilt-wall panel construction which allowed construction to be completed and open for school in under 11 months.
Doug Masch was the Project Manager on Palmetto Elementary while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.
Palmetto Elementary School

Villas Elementary – Fort Myers, Florida


Renovation work consisted of replacement of windows in all classrooms, new floor finishes, ceilings and lighting, new classroom millwork. Egress improvements, renovations of existing group restrooms, expansion of clinic, new entrance façade, replacement & upgrade of classroom HVAC, demolition of Amphitheatre and canopy relocation, replacement of existing P.E. structure with School District Prototype and roof repair at the Music/Art Building. This renovation work consisted of 14 different phases all of which were completed while the facility was occupied.
Doug Masch was the Project Manager on this project while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.
Villas Elementary

Wa-ke Hatchee Park – Fort Myers, Florida


Construction of a new Lee County Park totaling 48 acres of developed ball fields, lakes, walk paths, restroom building, tennis courts, playground, parking and maintenance building. The construction was conducted adjacent to tidal influenced wetlands. This led to many challenges that were overcome through continuous, effective and concise communication with multiple governmental authorities (SFWMD, Lee County Construction & Design, Lee County Parks Department and Lee County Stormwater).
Doug Masch was the Project Manager on this project while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.
Wa-ke Hatchee

Wal-Mart # 8150, 579, 623, 721, 769, 5391, 8173 – Port St. Lucie, St. Augustine, Ft. Myers, Port Charlotte, Venice, Naples & Miromar, Florida


Remodels of seven (7) different Sam’s Club and Wal-Mart Supercenters totaling over $2.5 million and were completed between the months of April and October. At any given time there were three (3) projects that were under construction simultaneously. These remodels consisted of complete interior and exterior re-paint, joint sealants, signage, millwork/laminate replacement, complete store flooring replacement, refrigeration replacement, vision centers, hearing centers, electrical upgrades, plumbing upgrades, tire and lube upgrades, restroom ADA compliance, plastic laminate wainscot, ceramic tile, oven and dishwasher upgrades and epoxy flooring. All construction activities were completed while maintaining a fully operational and functional store. Safety and the ability not to disrupt sales and the customer experience was paramount to the success of these projects.
Doug Masch was the Project Manager on this project while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.
Walmart

Gulf Elementary Mechanical Renovations – Cape Coral, Florida


Renovations consisted of complete removal and replacement of all HVAC systems (chillers, air handlers, piping, duct work and insulation), fire protection systems, upgrade to electrical and plumbing systems, construction of new walls, painting and installation of new acoustical ceiling This work was conducted in three (3) phases two of which were completed while the school was occupied. Phase II consisted of two (2) chiller removal and replacement and five (5) air handlers removal and replacement , construction of new walls, painting and acoustical ceiling which occupied approximately 66% of the school. The phase II work was completed in seven (7) weeks.                                                                                                                                                                              Doug Masch was the Project Manager on this project while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.

Wal-Mart # 4794 Pond liner and Underdrains – Lakeland, Florida


This site / civil project was a refurbishment to an existing storm retention system. The existing pond liner and underdrains were removed in their entirety. The bottom and slopes were re-graded to meet proposed grades. Concrete pipe and mitered end sections were removed and replaced to meet new elevations and match the new slopes/banks. Modifications to the pond outlet structure were performed. New rip-rap was installed around the newly installed mitered end sections. Construction activities for this project were completed in the months of June and July. This project was completed on time, within budget and required effective communication with Wal-mart and the local / state agencies.
Doug Masch was the Project Manager on this project while employed at a previous construction company, this was not an actual project completed by DEC Contracting Group, Inc.
Walmart
Walmart